Deliverables

The following list shows the deliverables submitted to, and approved by, the European Commission. The documents without links are deliverables to come or to be approved, or else they are confidential.

Last updated: 9 December 2021.

Work package 1: Administration

D_1_01: Notes of the BEATS kick-off meeting, held 12. and 13.03.2019 on site in Allan, Jordan

D_1_02: Report on the establishment of the BEATS project web site.

D_1_03: The BEATS Concept Poster

D_1_04: Notes of the 2019 meetings of the BEATS Steering Committee (confidential)

D_1_05: Notes of the first BEATS Annual Meeting, held 27. and 28.02.2020 at ALBA, Barcelona, Spain

D_1_06: Notes of the 2020 meetings of the BEATS Steering Committee (confidential)

D_1_07: Notes of the second BEATS Annual Meeting, held remotely on 17.02.2021

D_1_08: BEATS Thematic Posters

D_1_09: Notes of the 2021 meetings of the BEATS Steering Committee (confidential)

D_1_10: Notes of the third BEATS Annual Meeting, held on 13/12/2022, remotely

D_1_11: Notes of the 2022 meetings of the BEATS Steering Committee (confidential)

D_1_12: Notes of the fourth BEATS Annual Meeting to be held at SESAME, Jordan in June 2023

D_1_13: List of published articles

 Work package 2: Science Case, Sustainability, Stewardship

D_2_01: The BEATS Science Case.

D_2_02: A list of suitable suppliers for the BEATS hard and software (confidential).

D2.03: Report on BEATS funding and stewardship models (confidential).

Work Package 3: The x-ray source and Front End.

D_3_01: Report on the choice of the source concept: A superbend or a three-pole wiggler?

D_3_02: The final design of the x-ray source.

D_3_03: Report on the design and the thermal analysis of the BEATS Front End

D_3_04: The technical specifications of the x-ray source’s magnets.

D_3_05: The technical specifications of the BEATS Front End.

D_3_06: Report on magnetic measurements and characterisation

Work package 04: Technical design of the BEATS beamline.

D_4_01: The BEATS Technical Design Report

D_4_02: The technical specifications of the Radiation Safety Hutches.

D_4_03: Report on the delivery of the Double Multilayer Monochromator (confidential)

D_4_04: Report on the delivery of the Sample End Station (confidential)

Work package 5: Procurement and construction of the beamline infrastructure

D_5_01: Report on the CfT: Radiation Protection Hutches

D_5_02: Report on the CfT: Personnel Safety System

D_5_03: Report on the site acceptance test of the Radiation Protection Hutches (confidential)

D_5_04: Report on the site acceptance test of the Personnel Safety System (confidential)

D_5_05: Report on the site acceptance test of the technical beamline infrastructure (confidential)

D_5_06: Report on the EMRC requesting radiological permission, license, to operate the beamline (confidential)

Work package 6: Beamline assembly and commissioning

D_6_01: Report on the commissioning of the beamline optical components.

D_6_02: Report on the commissioning of the beamline experimental components

D_6_03: Beamline operation manual for staff and users

Work package 07: Data management and analysis

D_7_01: A list of required hard- and software

D_7_02: The SESAME data policy

D7.03: Report on the site acceptance test of the computing hardware (confidential)

D_7_04: Report on the successful adaptation of the tomography software